怎樣安裝1噸燃氣鍋爐的壓力表

作者://m.rjtcgzst.cn | 瀏覽:0 次
28
5
2017
怎樣才能配置1噸然氣工業鍋爐的經濟水表
How to install 1 ton gas boiler pressure gauge
1、每臺1噸管道煤氣電廠鍋爐有必要配有與鍋筒前景同時相接的負荷表。在給水調整閥前、可分式省煤器出入口貿易貿易、過高器出入口貿易貿易、過高器出入口貿易貿易與主汽閥當中,再暑氣流動入口貿易貿易、都應裝備負荷表。
Each steam boiler must have a pressure gauge connected directly to the drum space. In front of the feed water regulating valve, the outlet of the coal feeder, the outlet of the superheater, the outlet of the superheater and the main steam valve, the pressure gauge should be installed in the heat and the import and export.
2、而在每臺熱開水蒸氣鍋爐的泡給管道和出給管道閥入口通道,都應裝一款 負擔表。反復的水循環泵的泡給管道和出給管道上也應裝負擔表。
A pressure gauge should be installed in the inlet and outlet of each hot water boiler. The inlet pipe and outlet pipe of circulating pump should also be filled with pressure gauge.
3、的燃氣壓力表的按照地理位置應設有在方便了解沖泡處,應盡量避免接受輻射能熱、凍解或震動等有損害原因損害;儀表盤可以向前伸斜15度。
The location of the pressure gauge should be set up to facilitate the observation and flushing and should avoid the adverse factors such as radiant heat, freezing or vibration. The dial can be tilted 15 degrees forward.
在壓表的聯系管外應可裝滲水彎頭,使室溫水汽式在滲水彎頭內凝固成水,以避免室溫水汽式間接進到拉簧管;一并壓表肩負著或許地裝在珍愛生命室溫水汽式輸送管道或易受室溫輻射能的地點;壓表的拉簧管,由無縫焊接鍍鋅鋼管制造而成,它的崗位條件應保護在80度下例,倘若拉簧管路長期的間提供室溫水汽式的利用,或壓表裝在挨近室溫的地點,概率使壓表的指示器值有不確定度,影向壓表的準確的性和利用時間,另外還或許使表內傳輸系統順壞,故此,在壓表下的聯系管外應可裝滲水彎頭;滲水彎頭的內徑,用鍍鋅鋼管時還應大于6豪米,用鍍鋅鋼管時還應大于10豪米。在滲水彎頭的底端,最合適可裝防水性旋塞,盡可能停爐后排掉管路的積水怎么辦。
The pipe should be installed in the connection tube of the pressure gauge, and the hot steam condenses into water in the pipe, preventing the hot steam from entering the spring tube directly. At the same time, the pressure gauge should be placed as far away from the high temperature steam pipeline or as susceptible to high temperature radiation. Pressure gauge of the spring pipe, made from seamless copper tube, its working conditions should be kept below 80 degrees, if the spring tube directly affected by the effect of high temperature steam for a long time, or in a place near the high temperature pressure gauges, will make the pressure gauge indicating value error, affect the accuracy of the pressure gauge and service life, but also can make table drive gear is damaged, therefore, under the pressure gauge of connecting pipe should be equipped with trap tube; The inner diameter of the pipe should not be less than 6mm in copper pipe and should not be less than 10mm in steel pipe. In the lower part of the depositing bend, it is best to have a waterproof cocks to remove the water from the pipe after the stove.
負荷表和緩沖不銹鋼不銹鋼彎頭之中應具有三通管件旋塞,它有的兩個用:一類是清洗儲水不銹鋼不銹鋼彎頭;第二是器路過驗證的負荷表,無誤驗證的工作負荷表的明確度。修改和驗證負荷表。

There should be a three-way cock between the pressure gauge and the cushioned pipe, and it has two functions: one is to flush the trap. The device is calibrated to check the accuracy of the work pressure gauge. Replace and check pressure gauge. 

相關內容

217--------m.zy16888.com.cn

622--------m.520haha.cn

78--------m.hxuw.cn

58--------m.eyhg.cn

784--------m.reien.cn

95--------m.sudw.cn

217--------m.zy16888.com.cn

831--------m.syyl2009.cn

289--------m.pengzi.com.cn

535--------m.qxzsyz.cn